Welcome from Fredericksburg. If you haven't heard, the Karb Kings are having there annual show in Fredericksburg on Oct. 13th. It's well worth the drive down from Alexandria.
Dead in the water :eek:
I've been really busy with customer work. Doesn't leave any time to work on my own stuff but does keep the lights on when I do get back on it [cl
Passenger side goes the same way.
Cut giant hole.
Install enough cleco's to make Frankenstein blush
Set nice tight gaps
Pass. side quarter is ready to start welding in. Hey! It looks like a 2 door all of a sudden!
Every day is one day closer to the fun part...
Cool, glad to hear you could get something out of this thread, makes it worth posting!
This video can explain Cleco's better and quicker than I ever could by typing ---> http://www.youtube.com/watch?v=lgEIVUVLrnQ
Got my roof all welded up and started finishing it.
Slowly but surely coming out nice, gonna take quite awhile.
I'm really pleased how the driprail came together.
Got the quarter panel seam welded up as well, gonna be a pain to finish since I can't get behind it to work on...
Thanks Tyster!
Thanks man! All I can say is go for it! It's only metal, pound on it long enough and it'll look like you want it to.
Awsome, glad you can get something out of it, makes it worth the time of posting it! [cl
I wish that was one days work! It's 4 days working roughly 9-5 minus...
Getting everything fitted up just right before welding is the most crucial part. I made a handful of these tabs to keep everything cleco'd in place like so..
A piece of TIG wire makes an easy contour gauge to see if anything needs bumped around before tack welding.
After getting...