Hey All, Clipper here, back after a long summer of racing. Back in january I was given the task to head up our teams fabrication shop. We bought out what was left of a major shop (24 employees at its height) that had fallen on hard times. The shop had been packed up and stuffed into 2 25x50 bays. After a few weeks of sorting thru boxes and pallets of parts,jigs,fixtures and equipment we started with 4 empty bays (approx 6000 sq ft). Coming up with the placement of all this equipment was quite a job. Heres some pics of what I get to work with.
Front clip jig Tubing bender Tig machine and welding table
tubing rack (filled now) 2 mills 1 lathe 2 drill presses
Repair jig with a weekly casualty
One of my first new cars on the building jig
I have been busier than a one legged man in a a$$ kicking contest this summer but it has been quite an experience. I will be posting some pics of the builds I have going on at my home shop soon. Clipper.
I have been busier than a one legged man in a a$$ kicking contest this summer but it has been quite an experience. I will be posting some pics of the builds I have going on at my home shop soon. Clipper.