Kultureshot
Active member
Here is my new project and the progress from week 1 of the build. So far we have gotten the body welded back together and braced up and chopped. I straightened out the trunk lid that was caved in. We cut the posi-track rearend we are going to freshen up and use out of the tree it was growing into lol. Plus we setup our new shop and ordered everything we needed to start with and picked up a truck load of raw metal to start with.