Due to snow and cold i decided to take the doors off and work on rust in side. Cut out ruff bondo patches and made some panels out of 16 gauge i had left over from floor rebuild.
i haven't worked much on the truck as of late due to ball shiverin cold that's settled down here in upstate N.Y. Going to start up again this weekend. ( heat wave on the way high of 40 deg.)
I'm working on the dash, steering column, steering box and glass. i will post picts soon. Too cold out there for long periods of work. The coldest February ever with an average temp of 10 deg. most days start at -10 and rise to around 15 to 20. BRrrrrrrrrrr.
INSTALLED NEW STEERING COLUMN ,BOX AND AM MAKING intermediate shaft. went back to scrap yard to get a shifter and cable setup and the cab over i was going to pick it from was gone. Good thing i know where a bunch of old scrapped school buses are.