Thanks for the Kind words! I guess I really did not want push her out until I was happy with they way it turned out. This took a long time for me to build (4 yrs). I hope by this spring that im able to turn the key and take her for a ride!
Here is another view of right before I dropped the cab on the frame. The copper lines are all TIG welded joins. I did pressure check them before mounting so I hope it works! I plan to first fill the system with water to flush it out and if there is a leek, it less to worry about.
That's one of my problems. I spun the rear tire 1 revolution and the pinion only spun 2.25. Its a Eaton Axle and my plans are to test it, even though its not ideal.