Mike S.
Well-known member
After making a ton of changes to my mock-up, I finally started the real thing. I pinched the front rails 3 degrees and ended up running the rear rails horizontally and square. The rear is setup so I can run either a parallel four-link with a panhard bar, or a triangulated four-link with the lower links being angled (satchell link) since I need the room behind the cab for the radiator. The fuel cell will go behind the rear end. Eventually, I will put angled kickers that tie the ends of the crossmember to the front rails. So far so good, I think.[