More boring floor work....
Getting close to the end of it.[cl
Pic 1. Secured the outer toe board pieces and cut and bent the center section.
The top line actually lines up very well once I screwed it into place.
Pic 2. Access panel trimed up and set in place.
Pics 3-6. Picked up some 22 gauge metal to use for the corner pieces. Since at this point the corners are no longer a support piece but there to help seal up the cab floor I wanted something thinner that I could cut with snips.
Pattern made and PS done. Flipped it over and with a little touch up the pattern worked for the DS as well.
![Big grin :D :D](data:image/gif;base64,R0lGODlhAQABAIAAAAAAAP///yH5BAEAAAAALAAAAAABAAEAAAIBRAA7)
I really payed attention to measurements and squareness when I put in the floor frame so I think that it is paying off.
![Cool :cool: :cool:](data:image/gif;base64,R0lGODlhAQABAIAAAAAAAP///yH5BAEAAAAALAAAAAABAAEAAAIBRAA7)
After all that talk of gluing things in my floorboard discussion and since the corner pieceswhere going to be plug welded to the new floor I decided to use adhesive to attach them. 2-part industrial epxoy. So we will see how they hold.
Pic 7 shows what is left out of the 4'x8' sheet of metal I started with.
The plan is to weld a couple of spots that I missed then hit the seams with the sealer. Hopefully tomorrow or Saturday.
Thanks for visiting...
Torchie.