Gunzenrosa
Well-known member
Well didn't do anything today. Took a little break after getting the control arm ends welded onto the control arms yesterday. Also received the rad and inter cooler via courier yesterday. Now to figure out where and how I'm going to mount them. The following pictures are just my first thoughts of where things are going to go, more than likely I'll put the inter cooler in front of the rad and not tucked under the engine. We will see.
Here are the control arms, they are 2" Dom tubing with 1/4" wall with 2" greasable bushings on one end and 1.25" heim joints on the other. These will attach to the bottom of the front axle and frame. I will be building a partial upper arm that will attach to the top of the axle back down to the lower arm, perhaps these are wish bones then? I dunno the proper term
Here's an idea of what I'm working with for the rad and inter cooler
The square tubing is there to line up the front axle initially and nothing more. Not sure if it's the best way or not but it works.[S
Here are the control arms, they are 2" Dom tubing with 1/4" wall with 2" greasable bushings on one end and 1.25" heim joints on the other. These will attach to the bottom of the front axle and frame. I will be building a partial upper arm that will attach to the top of the axle back down to the lower arm, perhaps these are wish bones then? I dunno the proper term
Here's an idea of what I'm working with for the rad and inter cooler
The square tubing is there to line up the front axle initially and nothing more. Not sure if it's the best way or not but it works.[S