done lots of work in the past 2 days, finished building and welding frame brackets, just need to clean all the random tabs and brackets before i clean it and paint. welded in the floor of the cab, and just have to measure and test fit the drrivetrain so i can final weld in the tunnel support and tranny cover. so right now its a large center opening. with both sides braced for seats, but center is open and waiting for drivetrain fitment. once thats done i can build cab mounts and then get that mounted and really sittin pretty.
bought tons of goodies; bags for the rear, brackets, control links/panhard joints etc. bought some cragar soft 8's 15x10's for the rear. fronts need a different bolt patter, so have to wait and order those. but once everything comes in ill have an almost complete rolling chassis. sorry for delays, but needed to post some progress.