donsrods
Well-known member
It's been so long since I posted any updates on my rpu project that I figured I would just start again with a new thread. Over the past year, with health and other issues, I really just let it lay dormant. But I have decided to try to have it on the road for Turkey Run in November, so I am hitting on it once again.
The running gear is basically done. I have a crate 350 Chevy in it, TH350, and 8 inch rear. All of that is pretty much done. Now I am down to a few small items and bodywork and interior.
Dan has been welding in the two front cowl patch panels for me, and he is done on that phase right now. So, I can strip the body to bare metal and start getting it prepped for paint. (not sure of color or finish yet)
I also picked up the custom made fuel tank I had a local shop build for me, it looks exactly like I hoped. I checked the dimensions on an on line calculator, and it should hold about 7.5 gallons of gas. This is the largest tank I could fit in the shortened bed under the louvered tonneau cover.
I still have to install it and install the fuel sender, and will start on that today.
The running gear is basically done. I have a crate 350 Chevy in it, TH350, and 8 inch rear. All of that is pretty much done. Now I am down to a few small items and bodywork and interior.
Dan has been welding in the two front cowl patch panels for me, and he is done on that phase right now. So, I can strip the body to bare metal and start getting it prepped for paint. (not sure of color or finish yet)
I also picked up the custom made fuel tank I had a local shop build for me, it looks exactly like I hoped. I checked the dimensions on an on line calculator, and it should hold about 7.5 gallons of gas. This is the largest tank I could fit in the shortened bed under the louvered tonneau cover.
I still have to install it and install the fuel sender, and will start on that today.