....body off the chassis /frame -am still measuring it all before it goes so I can weld up the new frame ....
quite handy as now I can stitch the new floor frame in then replace the lower body rust,
got some floor rails folded in 1.6mm
.... having sold the original running gear last weekend for $300 ,, ( im now only down $30 now (cost of gas tank) )
bargain id say ......
now have to sort out my worn spool holder in the mig ... while mrs crate is distracted with her new chickens.....
over & out
quite handy as now I can stitch the new floor frame in then replace the lower body rust,
got some floor rails folded in 1.6mm
.... having sold the original running gear last weekend for $300 ,, ( im now only down $30 now (cost of gas tank) )
bargain id say ......
now have to sort out my worn spool holder in the mig ... while mrs crate is distracted with her new chickens.....
over & out