Torchie
Well-known member
I've seen a bit of his stuf, bob.There's a guy on You Tube that does things our way. Fitzee is his name.
Are you counting spools of MIG wire?
Thanks LB. Bringing it back from the dead. One tack at a time. [ddd [ [ [lots of work but worth it in the end
Fits in with the day. Out with the old. In with the new.
16 Gauge-1 inch square steel tubing.
Give it 2 Torchie grunts to put a bow in it.
Cut out the smashed area on the Custom body
Trim up the donor piece and tack it in place. Minus the corners.
Cut away more of the old bad and clamp on the new good.
Tack that in as well.
I can live with that.
Just because.... Clamped on the splash panel.
My original plan was to fab the weather strip channel as well but the more I cut away the junk the more I realized the channel it's self is solid. If I need to I can splice in good channel from other spots from the donor. Anything I don't have to make is one less thing I have to do.
This entire area will get welded up solid once I have the lower corners in then eventually the splash pan will get welded and moulded in To.
Have a safe and Happy New Year, all.
Keep on keeping on.
Torchie