Torchie
Well-known member
Can't pass up a sunny 45 degree day in February.
Out in the shop and working on the final shaping of the starboard side new chine despite lingering Low BP issues.
Planned down the height as well as the width. Refitted old planks to check for fit. Looks good so far. Once I have the inner ply installed along with a layer of 3M 5200 the new bottom planks will be flush to the edge of the chine cover. I'm about 75 percent of the way done with this side. Just have to finish up the last 4 feet that goes towards to bow. This is the tricky part.
Keep on keeping on.....
Tortchie
Out in the shop and working on the final shaping of the starboard side new chine despite lingering Low BP issues.
Planned down the height as well as the width. Refitted old planks to check for fit. Looks good so far. Once I have the inner ply installed along with a layer of 3M 5200 the new bottom planks will be flush to the edge of the chine cover. I'm about 75 percent of the way done with this side. Just have to finish up the last 4 feet that goes towards to bow. This is the tricky part.
Keep on keeping on.....
Tortchie